MODIS IOT Aqua Weekly Report
Mission Operations Days: 2013/159 through 2013/165
June 8, 2013 00:00:00 GMT to June 14, 2013 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Friday, June 7, 2013
2013/158 14:44:46-14:50:30 Real-Time MOD_MEM__PM_LOAD(‘PM1_MPR_MOD_111_CPM31_EMPTY’,1024,’N’,’DISABLE’,1,32)
2013/158 15:08:37-15:15:02 Real-Time MOD_MEM_PM_DUMP(‘MACRO_31’,1024,0,0,1,32)
Saturday, June 8, 2013
None
Sunday, June 9, 2013
None
Monday, June 10, 2013
2013/161 15:33:50-15:35:33 Real-Time MOD_MEM_PM_LOAD(‘PM1_MPR_MOD_111_CPM31_SR_SPEC_P1_20W’,475,’N’,’DISABLE’,1,15)
2013/161 15:08:37-15:15:02 Real-Time MOD_MEM_PM_DUMP(‘MACRO_31’,475,0,0,1,15)
2013/161 20:59:44-21:13:42 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2013/161 22:38:37-22:52:35 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Tuesday, June 11, 2013
Wednesday, June 12, 2013
None
Thursday, June 13, 2013
2013/164 12:23:49-12:24:05 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2013/164 12:26:49-13:18:31 MCL MOD_OA22_SRCA_FULL_SPECT_1.2
OA-22: SRCA Full Spectral Calibration Part 1
20W-lamp data collection is from 12:42:43-13:18:30.
2013/164 13:41:36-13:45:08 Real-Time MOD_MEM_PM_LOAD(‘PM1_MPR_MOD_111_CPM31_SR_SPEC_P2_20W’,804,’N’,’DISABLE’,1,26)
2013/164 13:45:27-13:52:52 Real-Time MOD_MEM_PM_DUMP(‘MACRO_31’,804,0,0,1,26)
2013/164 14:42:12-14:42:34 Real-Time FSW_ISC_CLEAR_INHIBIT(63)
2013/164 17:40:00-18:14:32 MCL MOD_OA22_SRCA_FULL_SPECT_2.2
OA-22: SRCA Full Spectral Calibration Part 2
20W-lamp data collection is from 17:40:00-18:14:31.
2013/164 18:59:25-18:59:41 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2013/164 19:02:25-19:53:26 MCL MOD_OA22_SRCA_FULL_SPECT_3.1
OA-22: SRCA Full Spectral Calibration Part 3
10W-lamp data collection is from 19:18:52-19:53:25.
2013/164 20:55:47-21:33:48 MCL MOD_OA22_SRCA_FULL_SPECT_4.1
OA-22: SRCA Full Spectral Calibration Part 4
10W-lamp data collection is from 20:55:47-21:33:47.
Friday, June 14, 2013
2013/165 19:19:40-19:23:54 Real-Time MOD_MEM__PM_LOAD(‘PM1_MPR_MOD_111_CPM31_EMPTY’,1024,’N’,’DISABLE’,1,32)
2013/165 22:33:3719-22:39:57 Real-Time MOD_MEM_PM_DUMP(‘MACRO_31’,1024,0,0,1,32)
This Week’s Scheduled MODIS Activities Not Completed:
None
This Month’s Upcoming MODIS Events:
June calibrations will include an Aqua ECal (167), an SRCA Radiometric (168), and an Aqua lunar roll (170).
Sunday, June 16, 2013
2013/167 21:13:52-21:16:23 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration
Centered on S/C maximum latitude at 21:15:07.
Monday, June 17, 2013
2013/168 20:27:39-20:27:55 MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2013/168 20:30:39-21:01:04 MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection centered on S/N Night 20:46:40-21:01:03.
S/C Night 20:34:37-21:08:49.
Wednesday, June 19, 2013
Lunar Roll Maneuver (-14.2568 degree roll)
2013/170 11:10:45 MCL MOD_OA03_FR_DAY_RATE.1
2013/170 11:56:49 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2013/170 12:32:30-12:39:16 MCL MOD_OA08_ROLL_MAN.1
2013/170 12:53:01 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2013/170 13:39:05 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
None
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 309.3 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 116.3 of 500 hours
SRCA 1W Lamp #1: 528.2 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 3086 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements