MODIS IOT Aqua Weekly Report
Mission Operations Days: 2013/229 through 2013/235
August 17, 2013 00:00:00 GMT to August 23, 2013 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, August 17, 2013
Lunar Roll Maneuver (-19.8433 degree roll)
Friday, August 16, 2013
2013/228 23:17:10 MCL MOD_OA03_FR_DAY_RATE.1
Saturday, August 17, 2013
2013/229 00:03:22 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2013/229 00:43:07-00:49:53 MCL MOD_OA08_ROLL_MAN.1
2013/229 00:59:26 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2013/229 01:45:37 MCL MOD_OA03_FR_NIGHT_RATE.2
Sunday, August 18, 2013
None
Monday, August 19, 2013
Tuesday, August 20, 2013
None
Wednesday, August 21, 2013
None
Thursday, August 22, 2013
None
Friday, August 23, 2013
None
This Week’s Scheduled MODIS Activities Not Completed:
None
This Month’s Upcoming MODIS Events:
September activities will include an SD/SDSM (open and screened) (245), an ECal (251), Radiometric (252), Lunar Roll (258), BB Warm Up Cool Down (259-261), and an Aqua SD (screen only) (266).
Maneuvers:
Lunar Roll 2013/229 0:30:29- 1:00:31,
LOPA: 2013/299 0:30:29 - 1:05:31z
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 309.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 116.6 of 500 hours
SRCA 1W Lamp #1: 528.2 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 3090 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements