MODIS IOT Aqua Weekly Report
Mission Operations Days: 2013/243 through 2013/249
August 31, 2013 00:00:00 GMT to September 6, 2013 00:00:00 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, August 31, 2013
None
Sunday, September 1, 2013
None
Monday, September 2, 2013
2013/245 20:30:11-20:44:09 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2013/245 20:09:03-22:23:01 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Tuesday, September 3, 2013
None
Wednesday, September 4, 2013
None
Thursday, September 5, 2013
None
Friday, September 6, 2013
None
This Week’s Scheduled MODIS Activities Not Completed:
None
This Month’s Upcoming MODIS Events:
September activities will include an SD/SDSM (open and screened) (245), an ECal (251), Radiometric (252), Lunar Roll (258), BB Warm Up Cool Down (259-261), and an Aqua SD (screen only) (266).
Sunday, September 8, 2013
2013/251 20:48:42-20:51:13 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration
Centered on S/C maximum latitude.
Monday, September 9, 2013
2013/252 21:34:10-21:34:27 MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2013/252 21:37:10-22:07:35 MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data collection 21:53:11-22:07:34.
S/C Night 21:43:38-22:17:09.
Maneuvers:
Drag Makeup - 2013/205 - 14:25:00 - 16:24:10
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 309.9 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 116.6 of 500 hours
SRCA 1W Lamp #1: 528.2 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 3096 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements