Mission Operations Days: 2013/313 through 2013/319
November 9, 2013 00:00:00 GMT to November 15, 2013 00:00:00 GMT
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week’s Completed MODIS Activities:
Saturday, November 9, 2013
None
Sunday, November 10, 2013
None
Monday, November 11, 2013
None
Tuesday, November 12, 2013
Lunar Roll Maneuver (*-1.2651* degree roll)
2013/316 22:18:50 MCL MOD_OA03_FR_DAY_RATE.1
2013/316 23:05:05 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2013/316 23:44:35-23:51:21 MCL MOD_OA08_ROLL_MAN.1
Wednesday, November 13, 2013
2013/317 00:01:06 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2013/317 00:47:22 MCL MOD_OA03_FR_NIGHT_RATE.2
Thursday, November 14, 2013
None
Friday, November 15, 2013
None
This Week’s Scheduled MODIS Activities Not Completed:
None
This Month’s Upcoming MODIS Events:
November activities will include another SD/SDSM (screen and open) (329), and a BB Warm Up Cool Down (330-332).
Maneuvers:
Lunar Roll 2013/316 23:40:00- 23:53:56
MODIS Anomalies:
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/
Limited Life Item Status:
SRCA 10W Lamp #1: 312.1 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 117.1 of 500 hours
SRCA 1W Lamp #1: 528.7 of 5000 hours
SRCA 1W Lamp #2: 274.9 of 5000 hours
Solar Diffuser Door: 3106 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements