MODIS IOT Aqua Weekly Report
Mission Operations Days: 2015/199 through 2015/205
July 18, 2015 00:00:00 GMT to July 24, 2015 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, July 18, 2015
---
2015/199 03:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2015/199 21:00:00 MCL MOD_BB_TEMP_SET_280K_B.2
BB Temp Set to 280K for CP B Coefficients
Sunday, July 19, 2015
---
2015/200 01:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficients
2015/200 04:00:00 MCL MOD_BB_TEMP_SET_290K_B.2
BB Temp Set to 290K for CP B Coefficients
2015/200 08:00:00 MCL MOD_BB_TEMP_SET_315K_B.2
BB Temp Set to 315K for CP B Coefficients
2015/200 08:00:30 MCL MOD_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2015/200 12:00:00 MCL MOD_BB_TEMP_SET_270K_B.2
BB Temp Set to 270K for CP B Coefficients
2015/200 12:00:30 MCL MOD_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD
Monday, July 20, 2015
---
2015/201 08:00:00 MCL MOD_BB_TEMP_SET_285K_B.2
BB Temp Set to 285K for CP B Coefficient
Tuesday, July 21, 2015
---
None
Wednesday, July 22, 2015
---
None
Thursday, July 23, 2015
---
None
Friday, July 24, 2015
---
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's Upcoming MODIS Events:
---
July's routine activities include a SDSM_Screened/Open on 2015/187, a SDSM_Screened on 2015/208, a PV_Ecal on 2015/193, a SRCA_Radiometric on 2015/194, a SRCA_Spectral on 2015/211, a Blackbody_Cycle on 2015/199 and a Lunar Roll on 2015/208.
Non-routine activities include a Lunar Roll on 2015/208
Monday, July 27, 2015
---
2015/208 20:52:02-21:06:00 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
Thursday, July 30, 2015
----
2015/211 12:15:54-12:16:10 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2015/211 12:18:54-13:10:36 MCL MOD_OA22_SRCA_FULL_SPECT_1.2
OA-22: SRCA Full Spectral Calibration Part 1
20W-lamp data collection is from 12:34:48-13:10:35.
2015/211 17:32:04-18:06:36 MCL MOD_OA22_SRCA_FULL_SPECT_2.2
OA-22: SRCA Full Spectral Calibration Part 2
20W-lamp data collection is from 17:32:04-18:06:35.
2015/211 18:51:29-18:51:45 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2015/211 18:54:29-19:45:30 MCL MOD_OA22_SRCA_FULL_SPECT_3.1
OA-22: SRCA Full Spectral Calibration Part 3
10W-lamp data collection is from 19:10:56-19:45:29.
2015/211 20:47:51-21:25:52 MCL MOD_OA22_SRCA_FULL_SPECT_4.1
OA-22: SRCA Full Spectral Calibration Part 4
10W-lamp data collection is from 20:47:51-21:25:51.
Maneuvers:
---
Aqua MLC #129 will take place on on 2015/208.
Aqua DMU #99 took place on 2015/210.
Aqua IAM #47 took place on 2015/112.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/
Limited Life Item Status:
SRCA 10W Lamp #1: 344.3 of 500 hours
SRCA 10W Lamp #2: 188.8 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 129.6 of 500 hours
SRCA 1W Lamp #1: 527.2 of 5000 hours
SRCA 1W Lamp #2: 291.1 of 5000 hours
Solar Diffuser Door: 3234 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements