MODIS IOT Aqua Weekly Report
Mission Operations Days: 2016/037 through 2016/043
February 06, 2016 00:00:00 GMT to February 12, 2016 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, February 06, 2016
---
None
Sunday, February 07, 2016
---
None
Monday, February 08, 2016
---
None
Tuesday, February 09, 2016
---
None
Wednesday, February 10, 2016
---
None
Thursday, February 11, 2016
---
None
Friday, February 12, 2016
---
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's Upcoming MODIS Events:
---
February's routine activities include a SDSM_Screened/Open on 2016/032, a Lunar Roll on 2016/049, a SDSM_Screened on 2016/053, and a SRCA_Radiometric on 2016/053.
Non-routine activities include a Lunar Roll on 2016/049
Thursday, February 18, 2016
---
Lunar Roll Maneuver (-6.4257 degree roll)
2016/049 01:19:20 MCL MOD_OA03_FR_DAY_RATE.1
2016/049 02:05:24 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2016/049 02:21:37-02:28:23 MCL MOD_OA08_ROLL_MAN.1
2016/049 03:01:37 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2016/049 03:47:41 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
---
Aqua Lunar Roll will take place on 2016/049.
Aqua DMU #106 took place on 2016/042.
Aqua IAM #48 will take place on 2016/069.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 351.1 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 132.9 of 500 hours
SRCA 1W Lamp #1: 528.3 of 5000 hours
SRCA 1W Lamp #2: 294.4 of 5000 hours
Solar Diffuser Door: 3274 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements