MODIS IOT Aqua Weekly Report
Mission Operations Days: 2016/065 through 2016/071
March 05, 2016 00:00:00 GMT to March 11, 2016 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, March 05, 2016
---
None
Sunday, March 06, 2016
---
None
Monday, March 07, 2016
---
None
Tuesday, March 08, 2016
---
None
Wednesday, March 09, 2016
---
2016/069 15:37:44-15:39:14 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Nadir/Space View Door close command. Begins 1:30 before S/C day and
lasts 1:30.
Thursday, March 10, 2016
---
2016/070 13:48:35-13:48:51 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2016/070 13:51:35-14:43:17 MCL MOD_OA22_SRCA_FULL_SPECT_1.2
OA-22: SRCA Full Spectral Calibration Part 1
20W-lamp data collection is from 14:07:29-14:43:16.
2016/070 19:04:48-19:39:20 MCL MOD_OA22_SRCA_FULL_SPECT_2.2
OA-22: SRCA Full Spectral Calibration Part 2
20W-lamp data collection is from 19:04:48-19:39:19.
2016/070 20:24:13-20:24:29 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2016/070 20:27:13-21:18:14 MCL MOD_OA22_SRCA_FULL_SPECT_3.1
OA-22: SRCA Full Spectral Calibration Part 3
10W-lamp data collection is from 20:43:40-21:18:13.
2016/070 22:20:49-22:58:50 MCL MOD_OA22_SRCA_FULL_SPECT_4.1
OA-22: SRCA Full Spectral Calibration Part 4
10W-lamp data collection is from 22:20:49-22:58:49.
Friday, March 11, 2016
---
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's Upcoming MODIS Events:
---
March's routine activities include a SDSM_Screened/Open on 2016/074, a Lunar Roll on 2016/078, a Blackbody_Cycle on 2016/086-088, a SRCA_Spectral on 2016/070, a PV_Ecal on 2016/080 and a SRCA_Radiometric on 2016/081.
Non-routine activities include a Lunar Roll on 2016/078
Monday, March 14, 2016
---
2016/074 20:52:23-21:06:21 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2016/074 22:31:16-22:45:14 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
Friday, March 18, 2016
---
Lunar Roll Maneuver (-6.6066 degree roll)
2016/078 14:03:01 MCL MOD_OA03_FR_DAY_RATE.1
2016/078 14:49:05 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2016/078 15:05:33-15:12:19 MCL MOD_OA08_ROLL_MAN.1
2016/078 15:45:17 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2016/078 16:31:21 MCL MOD_OA03_FR_NIGHT_RATE.2
Sunday, March 20, 2016
2016/080 21:14:00-21:16:31 MCL MOD_OA27_PV_ECAL.1
OA-27: Photovoltaic bands electronics calibration.
Centered on S/C maximum latitude.
Maneuvers:
---
Aqua Lunar Roll will take place on 2016/078.
Aqua DMU #106 took place on 2016/042.
Aqua IAM #48 took place on 2016/069.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 353.7 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 134.3 of 500 hours
SRCA 1W Lamp #1: 528.4 of 5000 hours
SRCA 1W Lamp #2: 294.4 of 5000 hours
Solar Diffuser Door: 3276 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements