Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
---|---|---|
Component | State(s) | Comment |
Blackbody | A Off; B On (285K) | Nominal Science Mode |
Calibration Electronics | A Off; B On | Nominal Science Mode |
Control Processor | A Off; B On | Nominal Science Mode |
Nadir Door | Unlatched, Open | Nominal Science Mode |
Space View Door | Unlatched, Open | Nominal Science Mode |
Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
FDDI Formatter | A Off; B On | Nominal Science Mode |
FDDI Port | A Off; B On | Nominal Science Mode |
FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
Format Processor | A Off; B On | Nominal Science Mode |
Power Supplies | #1 Off, #2 On | Nominal Science Mode |
PV VIS FPA | A Off; B On | Nominal Science Mode |
PV NIR FPA | A Off; B On | Nominal Science Mode |
PV SMIR FPA | A Off; B On | Nominal Science Mode |
PV LWIR FPA | A Off; B On | Nominal Science Mode |
PC LWIR FPA | A Off; B On | Nominal Science Mode |
RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
RC LWIR FPA Heater | Off | Nominal Science Mode |
RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
Scan Assembly | A Off; B On | Nominal Science Mode |
SDSM | Off | Nominal Science Mode |
SRCA | Off
|
Nominal Science Mode |
PS1 Survival Heaters | Enabled | Nominal Science Mode |
PS2 Survival Heaters | Enabled | Nominal Science Mode |
Timing Generator | A Off; B On | Nominal Science Mode |
Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, October 29, 2016
--
None
Sunday, October 30, 2016
---
None
Monday, October 31, 2016
---
2016/305 20:54:04-21:08:02 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
Tuesday, November 1, 2016
---
None
Wednesday, November 2, 2016
---
None
Thursday, November 3, 2016
---
None
Friday, November 4, 2016
---
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's Upcoming MODIS Events:
---
November's routine activities include a SDSM_Open/Closed on 2016/326, a Lunar_Roll on 2016/315, and a PV_Ecal on 2016/332.
Non-routine activities include a Lunar Roll on 2016/315
Thursday, November 10, 2016
---
Lunar Roll Maneuver (-7.1573 degrees )
2016/315 16:44:04 MCL MOD_OA03_FR_DAY_RATE.1
2016/315 17:30:08 MCL MOD_OA03_FR_NIGHT_RATE.2 (03:23 early)
2016/315 18:10:43-18:17:29 MCL MOD_OA08_ROLL_MAN.1
2016/315 18:31:20 MCL MOD_OA03_FR_DAY_RATE.1 (03:23 late)
2016/315 19:12:24 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
---
Aqua Lunar Roll will take place on 2016/315.
Aqua DMU #112 took place on 2016/293.
Aqua IAM #51 took place on 2016/110.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 357.1 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours
SRCA 1W Lamp #1: 529.3 of 5000 hours
SRCA 1W Lamp #2: 294.4 of 5000 hours
Solar Diffuser Door: 3324 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements