MODIS IOT Aqua Weekly Report
Mission Operations Days: 2018/069 through 2018/075
March 10, 2018 00:00:00 GMT to March 16, 2018 23:59:59 GMT

Aqua Spacecraft and MODIS Instrument Status: 

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1 (functional)
  • 10W Lamps - 2, 3, 4 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode
 

This Week's Completed MODIS Activities:

Saturday, March 10, 2018
---
None

Sunday, March 11, 2018
---
None

Monday, March 12, 2018
---
2018/071 21:02:04-21:02:20 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current
feedback mode

2018/071 21:05:04-21:43:03 MCL MOD_OA23_SRCA_FULL_SPAT_10W.2
OA-23: SRCA Full Spatial Calibration - B Side

Data Collect from 21:21:12-21:43:02 (centered in S/C Night)
S/C Night 21:10:47-21:44:30

Tuesday, March 13, 2018
---
None

Wednesday, March 14, 2018
---
None

Thursday, March 15, 2018
---
None

Friday, March 16, 2018
---
None

This Week's Scheduled MODIS Activities Not Completed:

Thursday, March 15, 2018
---
2018/074 15:39:11-15:40:11 MCL MOD_NAD_AND_SVD_TO_CLOSED.1
Nadir/Space View Door close command. Begins 1:00 before S/C day and
lasts 1:00.

This activity was inhibited upon successful completion of IAM #58.

This Month's Upcoming MODIS Events:
---
March's routine activities include an SDSM_Closed on 2018/078 an SRCA_Spatial on 2018/071, an SRCA_Radiometric on 2018/66, and a Lunar_Roll on 2018/086.

Non-routine activities include a Lunar Roll on 2018/086.

Monday, March 19, 2018
---
2018/078 20:09:56-20:23:54 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side

Maneuvers:
---
Aqua Lunar Roll will take place on 2018/086.
Aqua DMU #127 took place on 2018/046.
Aqua IAM #58 took place on 2018/074.

MODIS Anomalies:
---
None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.

https://wapub32.eos.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 365.4 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours

SRCA 1W Lamp #1: 530.5 of 5000 hours
SRCA 1W Lamp #2: 300.6 of 5000 hours

Solar Diffuser Door: 3424 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements