MODIS IOT Aqua Weekly Report
Mission Operations Days: 2019/180 through 2019/186
June 29, 2019 00:00:00 GMT to July 5, 2019 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None |
Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, June 29, 2019
---
None
Sunday, June 30, 2019
---
None
Monday, July 1, 2019
---
None
Tuesday, July 2, 2019
---
None
Wednesday, July 3, 2019
---
None
Thursday, July 4, 2019
---
None
Friday, July 5, 2019
---
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's Upcoming MODIS Events:
---
July's routine activities include a Lunar Roll on 2019/193, and a SDSM_Closed/Open on 2019/196.
Non-routine activities include a Lunar_Roll on 2019/193.
Friday, July 12, 2019
---
Lunar Roll Maneuver (-15.5596 degrees)
2019/193 03:57:19 MCL MOD_OA03_FR_DAY_RATE.1
2019/193 04:44:53 MCL MOD_OA03_FR_NIGHT_RATE.2 (01:53 early)
2019/193 05:20:52-05:24-38 MCL MOD_OA08_ROLL_MAN.1
2019/193 05:38:05 MCL MOD_OA03_FR_DAY_RATE.1 (01:53 late)
2019/193 06:25:39 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
---
Aqua Lunar Roll will take place on 2019/193.
Aqua DMU #140 will take place on 2019/198.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 371.1 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours
SRCA 1W Lamp #1: 531.4 of 5000 hours
SRCA 1W Lamp #2: 303.9 of 5000 hours
Solar Diffuser Door: 3514 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements