pm1weekly_2019-236_2019-242

MODIS IOT Aqua Weekly Report
Mission Operations Days: 2019/236 through 2019/242
August 24, 2019 00:00:00 GMT to August 30, 2019 23:59:59 GMT

Aqua Spacecraft and MODIS Instrument Status:

 

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off
  • 10W Lamps - 1 (functional)
  • 10W Lamps - 2, 3, 4 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None

Nominal Science Mode

 This Week's Completed MODIS Activities:

Saturday, August 24, 2019
---
None

Sunday, August 25, 2019
---
None

Monday, August 26, 2019
---
2019/238 21:20:08-21:34:06 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side

2019/238 22:59:00-23:12:58 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side

Tuesday, August 27, 2019
---
None

Wednesday, August 28, 2019
---
None

Thursday, August 29, 2019
---
None

Friday, August 30, 2019
---
None

This Week's Scheduled MODIS Activities Not Completed:
---
None

This Month's Upcoming MODIS Events:
---
September's routine activities include a SRCA Radiometric on 2019/247, a Blackbody on 2019/253-256, and a SDSM_Closed on 2019/259.

Wednesday, September 04, 2019
---
2019/247 20:35:36-20:35:52 MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode

2019/247 20:38:36-21:06:08 MOD_OA19_SRCA_FULL_RAD_10W.3
SRCA Full Radiometric Calibration - B Side

Data collection 20:54:37-21:06:07.
S/C Night 20:42:07-21:15:45.

Maneuvers:
---
Aqua DMU #142 will take place on 2019/262.

MODIS Anomalies:
---
None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.

https://wapub32.eos.nasa.gov/

Limited Life Item Status:

SRCA 10W Lamp #1: 373.5 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours

SRCA 1W Lamp #1: 531.4 of 5000 hours
SRCA 1W Lamp #2: 303.9 of 5000 hours

Solar Diffuser Door: 3534 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements