MODIS IOT Aqua Weekly Report
Mission Operations Days: 2021/086 through 2021/092
March 27, 2021 00:00:00 GMT to April 02, 2021 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software | Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None |
Nominal Science Mode |
This Week's Completed MODIS Activities:
Saturday, March 27, 2021
---
None
Sunday, March 28, 2021
---
None
Monday, March 29, 2021
---
None
Tuesday, March 30, 2021
---
None
Wednesday, March 31, 2021
---
None
Thursday, April 01, 2021
---
None
Friday, April 02, 2021
---
None
This Month's Upcoming MODIS Events:
---
April’s routine activities include an SDSM Closed on 2021/095, an SDSM Open on 2021/095, a Nighttime Day Mode on 2021/099, a BlackBody WUCD on 2021/103-105, a Lunar Roll on 2021/113, an SDSM Closed on 2021/116, and an SDSM Open on 2021/116.
Non-routine activities include a Lunar Roll on 2021/113.
Next Week's MODIS Events:
---
Monday, April 5 , 2021
--
2021/095 20:04:57 – 20:18:55 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened – B-side
2021/095 21:43:51 - 21:57:49 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open – B-side
Friday, April 9, 2021
---
Nighttime Day Mode Observations
2021/099 21:30:10 MCL MOD_OA03_FR_DAY_RATE.1
2021/099 22:09:37 MCL MOD_OA03_FR_NIGHT_RATE.2 (10:00 early)
2021/099 22:37:00 MCL MOD_OA03_FR_DAY_RATE.1
2021/099 22:57:00 MCL MOD_OA03_FR_NIGHT_RATE.2
2021/099 23:19:04 MCL MOD_OA03_FR_DAY_RATE.1 (10:00 late)
2021/099 23:58:31 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
---
Aqua DMU #155 will take place on 2021/104
Aqua Lunar Roll will take place on 2021/113.
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Blackbody is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 381.6 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.0 of 500 hours
SRCA 1W Lamp #1: 532.4 of 5000 hours
SRCA 1W Lamp #2: 310.4 of 5000 hours
Solar Diffuser Door: 3662 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements