MODIS IOT Aqua Weekly Report
Mission Operations Days: 2025/046 through 2025/052
Mission Operations Days: 2025/046 through 2025/052
February 15, 2025 00:00:00 GMT to February 21, 2025 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA |
Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software |
Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
---
Saturday, February 15, 2025
--
None
Sunday, February 16, 2025
--
None
Monday, February 17, 2025
--
None
Tuesday, February 18, 2025
--
None
Wednesday, February 19, 2025
--
None
Thursday, February 20, 2025
--
None
Friday, February 21, 2025
--
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
None
This Month's MODIS Events:
---
---
February's routine activities include regular SD/SDSM calibrations (2025/041 and 055), and a Lunar Roll calibration (2025/039).
Next Week's MODIS Events:
---
Monday, February 24, 2025
--
2025/055 20:40:22 – 20:54:20 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened – B-side
2025/055 22:19:01 – 22:32:59 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open – B-side
Maneuvers:
---
None
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Blackbody is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 396.6 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.1 of 500 hours
SRCA 1W Lamp #1: 534.8 of 5000 hours
SRCA 1W Lamp #2: 326.6 of 5000 hours
Solar Diffuser Door: 4250 of 3022 Movements
Nadir Aperture Door: 1055 of 1316 Movements
Space View Door: 636 of 1316 Movements