MODIS IOT Aqua Weekly Report
Mission Operations Days: 2025/207 through 2025/213
July 26, 2025 00:00:00 GMT to August 1, 2025 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA |
Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software |
Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
---
Saturday, July 26, 2025
--
None
Sunday, July 27, 2025
--
None
Monday, July 28, 2025
--
2025/209 21:00:15-21:14:13 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened – B-side
2025/209 22:38:51-22:52:49 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open – B-side
Tuesday, July 29, 2025
--
None
Wednesday, July 30, 2025
--
None
Thursday, July 31, 2025
--
None
Friday, August 1, 2025:
--
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's MODIS Events:
---
July's routine activities include regular SD/SDSM calibrations (2025/181, 195, and 209), and a SCRA Radiometric Calibration (2025/185).
Next Week's MODIS Events:
---
Sunday, August 3, 2025:
--
2025/215 20:59:15 - 20:59:31 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using 10W lamps 1 and 4, and 1W lamp 5, in constant current feedback mode
2025/215 21:02:15 - 21:29:47 MCL MOD_OA19_SRCA_FULL_RAD_10W.3
OA-19: SRCA Full Radiometric Calibration.
S/C Night 21:06:48 - 21:38:22
Data Collect 21:18:16 - 21:29:46
Maneuvers:
---
None
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Blackbody is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 396.8 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.1 of 500 hours
SRCA 1W Lamp #1: 535.0 of 5000 hours
SRCA 1W Lamp #2: 326.6 of 5000 hours
Solar Diffuser Door: 4322 of 3022 Movements
Nadir Aperture Door: 1055 of 1316 Movements
Space View Door: 636 of 1316 Movements