Skip to main content

MCST Banner Image

Pm1weekly_2025_221_2025_227

MODIS IOT Aqua Weekly Report
Mission Operations Days: 2025/221 through 2025/227
August 9, 2025 00:00:00 GMT to August 15, 2025 23:59:59 GMT 
 
Aqua Spacecraft and MODIS Instrument Status:
PM-1 "Aqua" is in Fine Pointing Normal Mode    
FM1 MODIS is in B-Side Nominal Science Mode
   
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration Electronics A Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 On Nominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA

Off

  • 10W Lamps - 1 (functional)
  • 10W Lamps - 2, 3, 4 (non-functional)
  • 1W Lamps - 1, 2 (functional)
Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software

Rev BJ + 1 set of patches

  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode
This Week's Completed MODIS Activities:
---

Saturday, August 9, 2025

--

None


Sunday, August 10, 2025:

--
None
 

Monday, August 11, 2025

--
2025/223 20:12:26 - 20:26:24 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened – B-side
 
2025/223 21:51:01 - 22:04:59 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open – B-side
 
Tuesday, August 12, 2025
--
None
 
Wednesday, August 13, 2025
--
None
 
Thursday, August 14,  2025
--
None
 
Friday, August 15, 2025
--
None
 
This Week's Scheduled MODIS Activities Not Completed:
---
None
 
This Month's MODIS Events:
---
August's routine activities include regular SD/SDSM calibrations (2025/223, and 237) and a SCRA Radiometric Calibration (2025/215).
 
Next Week's MODIS Events:
---

None

 
Maneuvers:
---
None
 
MODIS Anomalies:
---
None
 
General Instrument Comments:
 
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Blackbody is heated to 285 K.
 
MODIS Telemetry Trends:
 
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
 
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
 

 
Limited Life Item Status:
 
SRCA 10W Lamp #1: 396.9 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.1 of 500 hours
 
SRCA 1W Lamp #1: 535.1 of 5000 hours
SRCA 1W Lamp #2: 326.6 of 5000 hours
 
Solar Diffuser Door: 4328 of 3022 Movements
Nadir Aperture Door: 1055 of 1316 Movements
Space View Door: 636 of 1316 Movements