MODIS IOT Aqua Weekly Report
Mission Operations Days: 2025/263 through 2025/269
September 20, 2025 00:00:00 GMT to September 26, 2025 23:59:59 GMT
Aqua Spacecraft and MODIS Instrument Status:
| PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
|---|---|---|
| Component | State(s) | Comment |
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA |
Off
|
Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software |
Rev BJ + 1 set of patches
|
Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
This Week's Completed MODIS Activities:
---
Saturday, September 20, 2025
--
None
Sunday, September 21, 2025:
--
None
Monday, September 22, 2025
--
2025/265 21:01:54 - 21:15:52 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened – B-side
2025/265 22:40:29 - 22:54:27 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open – B-side
Tuesday, September 23, 2025
--
None
Wednesday, September 24, 2025
--
2025/267 13:15:09 – 13:15:25 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2025/267 13:18:09 – 14:09:51 MCL MOD_OA22_SRCA_FULL_SPECT_1.2
OA-22: SRCA Full Spectral Calibration Part 1 10W-lamp
Data Collect: 13:34:03 – 14:09:50
2025/267 18:30:24 – 19:04:56 MCL MOD_OA22_SRCA_FULL_SPECT_2.2
OA-22: SRCA Full Spectral Calibration Part 2 10W-lamp
Data Collect: 18:30:24 – 19:04:55
2025/267 19:49:31 – 19:49:47 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode.
2025/267 19:52:31 – 20:43:32 MCL MOD_OA22_SRCA_FULL_SPECT_3.1
OA-22: SRCA Full Spectral Calibration Part 3 10W-lamp
Data Collect: 20:08:58 – 20:43:31
2025/267 21:48:35 – 22:26:36 MCL MOD_OA22_SRCA_FULL_SPECT_4.1
OA-22: SRCA Full Spectral Calibration Part 4 10W-lamp
Data collect: 21:48:35 – 22:26:35
Thursday, September 25, 2025
--
None
Friday, September 26, 2025
--
None
This Week's Scheduled MODIS Activities Not Completed:
---
None
This Month's MODIS Events:
---
September's routine activities include regular SD/SDSM calibrations (2025/251, and 265), a Blackbody Warm Up/Cool Down (2025/252), a SRCA Radiometric Calibration (2025/246), and a SRCA Spectral Calibration (2025/267).
Next Week's MODIS Events:
---
Thursday, October 2, 2025:
--
2025/275 20:17:50 - 20:18:06 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using 10W lamps 1 and 4, and 1W lamp 5, in constant current feedback mode
2025/275 20:20:51 - 20:48:23 MCL MOD_OA19_SRCA_FULL_RAD_10W.3
OA-19: SRCA Full Radiometric Calibration.
S/C Night 20:27:25 - 20:54:56
Data Collect 20:36:52 - 20:48:22
Saturday, October 4, 2025
--
Lunar Calibration (-12.4200 degrees)
2025/277 15:48:48 MCL MOD_OA03_FR_DAY_RATE.1
2025/277 16:36:23 MCL MOD_OA03_FR_NIGHT_RATE.2 (01:53 early)
2025/277 17:14:45 – 17:18:31 MCL MOD_OA08_ROLL_MAN.1
2025/277 17:29:16 MCL MOD_OA03_FR_DAY_RATE.1 (01:53 late)
2025/277 18:16:51 MCL MOD_OA03_FR_NIGHT_RATE.2
Maneuvers:
---
The Aqua Lunar Roll maneuver will take place on Saturday, October 4, 2025 (2025/277).
MODIS Anomalies:
---
None
General Instrument Comments:
FM1 MODIS is in Science Mode. The SVD and NAD are open, the survival
heaters are enabled, and the Blackbody is heated to 285 K.
MODIS Telemetry Trends:
The FM1 MODIS instrument telemetry is trending nominally.
Non-MODIS Significant Events:
The EMOS mission status webpage (which includes instrument data loss
records) can be found at the following URL. Note that a password is now
required to access the EOS mission links web pages. There are directions
at the URL below for how to obtain a username/password.
Limited Life Item Status:
SRCA 10W Lamp #1: 399.5 of 500 hours
SRCA 10W Lamp #2: 188.1 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 135.1 of 500 hours
SRCA 1W Lamp #1: 535.4 of 5000 hours
SRCA 1W Lamp #2: 326.6 of 5000 hours
Solar Diffuser Door: 4346 of 3022 Movements
Nadir Aperture Door: 1055 of 1316 Movements
Space View Door: 636 of 1316 Movements