Inclination Adjustment (IAM)
Title | Date UTC | Year of DOY | DOY | Command Load | Notes | MODIS Mission |
---|---|---|---|---|---|---|
Inclination Adjustment (IAM) | 2003 | 224 | Completion of return yaw slew to nominal pointing | Aqua | ||
Inclination Adjustment (IAM) | 2003 | 224 | Begin return yaw slew to nominal pointing | Aqua | ||
Inclination Adjustment (IAM) | 2003 | 224 | Completion of forward yaw slew to -95 degrees | Aqua | ||
Inclination Adjustment (IAM) | 2003 | 224 | Begin Aqua Demonstration Inclination Adjust Maneuver Forward yaw slew to -95 degrees | Aqua | ||
Inclination Adjustment (IAM) | - | 2001 | 347 | Fourth TDRS contact IAM | Terra | |
Inclination Adjustment (IAM) | - | 2001 | 347 | Third TDRS contact IAM | Terra | |
Inclination Adjustment (IAM) | - | 2001 | 347 | Second TDRS contact IAM | Terra | |
Inclination Adjustment (IAM) | - | 2001 | 347 | Inclination Adjust Maneuver First TDRS contact IAM | Terra | |
Inclination Adjustment (IAM) | - | 2000 | 119 | Inclination Maneuver; Post-inclination Drag Makeup Maneuver Real-time Inclination Maneuver #2 IAM Due to constraints in the scheduling software, the ATC - Set/Clear SciAbnormal Flag activity is no longer "blocking" the Inclination Maneuvers' time frames. This concession was required to allow for the scheduling of the contingency activities to close the Space View Door. | Terra | |
Inclination Adjustment (IAM) | - | 2000 | 118 | IAM Real-time Inclination Maneuver #1 | Terra |
Pagination
MODIS Events history files
The following Excel Spreadsheedts with calibration activities and Vdet-ltwk changes/tests are available for download:
- MODIS Instrument Operations Team Event History for AM-1 (Terra) Complete list of events
- MODIS Instrument Operations Team Event History for PM-1 (Aqua) Complete list of events
- Terra MODIS Calibration History Spreadsheet
- Aqua MODIS Calibration History Spreadsheet
- AM-1 ("Terra") MODIS ("PFM") Vdet-ltwk History
- PM-1 ("Aqua") MODIS ("FM1") Vdet-ltwk History
MODIS Events Notes
See list of command loads